In this guide
Finding an installer in England starts with a single question: is the person doing the work registered to certify it themselves, or will the work have to go through building control? An installer registered with a competent person scheme can self-certify that their work complies with building standards, and a building control body does not need to be notified for certain services or fittings where the owner employs such an installer1. Where the installer is not registered, the firm or the householder must give notice to the local authority of the intention to carry out the work in advance, and pay a notification fee3.
That split shapes everything else: the paperwork a household receives, the cost of compliance, and who is accountable if the work is wrong. Membership of a competent person scheme is voluntary, so registration is a choice an installer makes, not a licence the state imposes4. Checking it is therefore part of hiring, not an afterthought.
For grant-funded work the constraint is tighter still. The Boiler Upgrade Scheme provides upfront capital grants of up to £7,500 towards replacing fossil fuel heating, is installer-led, and requires the chosen installer to be certified by the Microgeneration Certification Scheme5. A household cannot apply for that grant itself, and cannot ask Ofgem to review a decision about it; only installers can6.
Finding an installer in England: where to start
The practical starting points are the registers themselves. For electrical work, the registered electrician directory at electricalcompetentperson.co.uk is the route the electrical safety bodies point households to8. For heat pumps, solar and other microgeneration, the government-endorsed Microgeneration Certification Scheme holds a find-an-installer directory, and official guidance suggests getting at least three quotes from reputable installers9. For general building work, ministers advise using builders registered with TrustMark, described as a trusted scheme that helps ensure work is done properly10.
These registers do different jobs and are not interchangeable. A competent person register exists so that an installer can self-certify their own work under the building regulations; MCS certification is what makes an installation eligible for certain grants and standards; TrustMark is a government endorsed quality scheme that operates as a competent person register for finding an installer who will assess the circumstances and property to identify suitable measures11.
The other constraint is the grant scheme attached to the work. Where a household wants Boiler Upgrade Scheme funding, the installer must be MCS certified, so the shortlist narrows before any quote is sought5. Where the work is funded through a local authority or energy company obligation route, the installer requirements come from that scheme's rules rather than from the building regulations. The installer requirements for grants and funded schemes page sets out how those conditions differ, and checking an installer before you sign covers the verification steps that apply to any of them.
Competent person schemes: registration that covers notification

A competent person scheme is the mechanism that lets an installer certify their own work instead of involving local authority building control. An installer registered with a scheme can self-certify that their work complies with building standards, and a registered installer is approved to carry out the work to comply with building regulations without involving local authority building control1. For the householder, that means no separate building control application, no inspection visit and no notification fee.
Membership is voluntary, and there are ongoing inspections of approved installers once they are in a scheme4. The schemes are designated in the regulations for particular types of work, and the exemption from notification applies to certain services or fittings, including fuel-burning appliances and replacement windows, where the owner employs an installer registered with a relevant scheme2.
For heating work specifically, official guidance in Wales states that oil fired boiler and solid fuel fired boiler installations should use an installer registered with the Competent Person Schemes3. The same logic applies to the trades that carry their own schemes: gas work through Gas Safe registration, oil and renewable heating through OFTEC, solid fuel and biomass through HETAS, windows and doors through FENSA or Certass, and electrical work through the Part P schemes. The competent person schemes page explains which scheme covers which trade, and the individual registration pages for Gas Safe, OFTEC, HETAS and FENSA and Certass set out what each one verifies.
The certificate matters as much as the registration. When work is complete under a scheme, the household receives a certificate showing the work was done by a registered installer13. That certificate is the evidence that building regulations compliance has been dealt with, and it is the document a future buyer, solicitor or grant auditor will ask for. Where a scheme covers electrical work, a copy of the Installer's Electrical Installation Test Certificate compliant with BS7671 must be obtained and supplied to the local authority14.
TrustMark: the government-endorsed quality mark
TrustMark is a government endorsed quality scheme, and it operates as a competent person register for finding an installer who will assess the circumstances and property to identify suitable measures11. Its reach extends beyond voluntary good practice into legislation: the Warm Home Discount (England and Wales) Regulations 2026 require that a boiler or central heating system be installed by, or under the responsibility of, a person registered with TrustMark, with a certificate of lodgement issued by the operator of TrustMark15.
The same condition appears in scheme delivery guidance. Measures covered by PAS and projects containing such measures, including MCS work, should be installed by or under the responsibility of a TrustMark registered installer and have a relevant certificate of lodgement16. In practice this means that for a defined set of funded measures, TrustMark registration is not optional decoration but a condition of the funding.
"We advise them to use builders registered with TrustMark, which is a trusted scheme, to ensure that work is done properly"
For a household, the value of TrustMark is threefold. It gives a register to search before hiring, it produces a certificate of lodgement that evidences the work, and it provides a dispute route if the work goes wrong. TrustMark takes homeowner support enquiries through an online form, and disputes can be raised by email at disputes@trustmark.org.uk17. The TrustMark registered businesses page covers what registration actually requires of a business, and how to complain about a TrustMark registered business sets out the escalation path.
What must be notified to building control, and what is exempt

The notification rules turn on who is doing the work. Where a registered competent person carries out the work, a building control body does not need to be notified for certain services or fittings, including fuel-burning appliances or replacement windows2. Where the installer is not a registered competent person, the position reverses: for heat pumps, the installer must notify an appropriate building control body before work begins18.
The same pattern applies across technologies:
| Work | Installer registered with a scheme | Installer not registered |
|---|---|---|
| Heat pump installation | No building control notification needed; installer gives notice that commissioning was carried out in accordance with the approved document18 | Installer must notify an appropriate building control body before work begins18 |
| Domestic electric vehicle charger | No notification needed19 | Relevant building control authority must be notified of the work19 |
| Boiler installation | Installer self-certifies under the scheme1 | Firm or householder gives notice to the local authority in advance and pays a notification fee3 |
| Rewiring of existing dwellings | Not notifiable where the installer is a member of a Competent Persons Self Certification Scheme20 | Notifiable to the council20 |
Northern Ireland operates a separate system. There, building control should also be notified prior to the commencement of stove installation work to allow a timely inspection to be arranged21. The installers in Northern Ireland page covers that regime, and installers in Scotland and installers in Wales cover the building warrant and Welsh arrangements respectively.
Part P: the rules for electrical work in a dwelling
Part P of the Building Regulations applies to all new electrical work in a dwelling, which must be designed and installed to account for it22. Dwellings include a house, a flat or a small commercial premises linked to domestic accommodation22. The Building Regulations set standards for electrical installation work in relation to dwellings, but they do not set standards for the safety of electrical appliances; they do require that fixed connections of appliances are safe23.
The recommended route is to hire an installer registered with a competent person scheme, a registered competent person, who can self-certify that the work meets the required standards22. Where the electrician is not registered as a competent person, or where the work is done by the householder, a Building Regulations application should be made to Building Control23. Approval can be sought from the relevant Building Control Body, either at the local authority or an Approved Inspector, who check compliance and, if satisfied, issue a certificate of compliance12.
Not all electrical work is notifiable. The Building Regulations allow certain works, known as non-notifiable or minor work, to be carried out without notifying building control or using a registered electrician23. Repairs, replacements and maintenance work, and extra power points or lighting points or other alterations to existing circuits, do not need to be reported, except in a kitchen or bathroom, or outdoors23. Adding lighting points, including light fittings and switches, to an existing circuit is non-notifiable where the work is not in a kitchen or special location and does not involve a special installation22.
The NICEIC registered electricians and NAPIT registered installers pages cover the two largest electrical registration bodies, and who can self-certify electrical work explains the boundary between notifiable and non-notifiable work in more detail.
Building regulations: the cost of non-compliance

The consequences of non-compliance fall on the household as well as the installer. Where building regulations are not followed, the work may have to be corrected or a fine paid1. For renewable installations, if the installer does not adhere to building regulations the local authority may serve an enforcement notice24.
The practical costs are wider than the fine. Uncertified work can surface at the point of sale, when a solicitor asks for building regulations completion evidence and none exists. It can also invalidate a grant claim: Boiler Upgrade Scheme audits may request a building completion certificate among the evidence for eligible self-build properties25. And it can complicate insurance, because an insurer assessing a claim for water damage or fire will want to know the installation was certified.
The remedy is usually retrospective but not free. Where work was carried out by an unregistered installer or by the householder, a Building Regulations application can still be made to the local authority or an Approved Inspector, who will check compliance and issue a certificate if satisfied12. That route carries an application fee and may require opening up finished work for inspection. The building regulations compliance certificate page explains what the certificate records and why it is asked for.
MCS certification: when your installer must hold it
MCS certification is required wherever a household wants to use the Boiler Upgrade Scheme. The chosen installer must be certified by the Microgeneration Certification Scheme, a nationally recognised certification scheme, for the installation to qualify5. Official guidance directs households to use the government-endorsed MCS directory to find certified installers9.
MCS certification is not a general competence licence. It certifies particular technologies to particular standards, which is why the MCS certified installers page and the MCS installation standards page matter: the certificate a household receives at the end of the job depends on the standard the installer was working to. The MCS certificate and handover documents page sets out what should be handed over.
Where a complaint about an MCS installer is not resolved, the householder can approach the MCS Administrator, who will advise how to make a complaint about the MCS installer26. That is a separate route from the consumer codes. The Renewable Energy Consumer Code and the HIES consumer code cover the conduct and deposit protection side of renewable installations, and MCS umbrella schemes explains what it means when an installation is carried out under another company's certification.
Grants applied through the installer: how the Boiler Upgrade Scheme works

The Boiler Upgrade Scheme is the clearest example in England of a grant that constrains installer choice. It provides upfront capital grants of up to £7,500 to encourage property owners to replace existing fossil fuel heating with low carbon systems such as heat pumps5. It opened on 23 May 2022 and closes on 30 December 20295. It covers England and Wales5.
The application is installer-led, with the installer applying for the grant on the property owner's behalf5. The installer discounts the grant from the invoice, applies to Ofgem, the scheme administrator, for a grant voucher, and redeems the voucher after installation and commissioning5. The grant application is a two-stage process: the installer submits a voucher application, Ofgem issues a voucher, the installer submits a voucher redemption application, and the installer receives the grant payment28.
Several conditions sit alongside the installer requirement. The property must have a valid energy performance certificate5. One grant is available per property, and no grant is available for hybrid heat pump systems, such as a combination of gas boiler and air source heat pump29. Unspent budget is not carried over to the next scheme year28. Where a household disagrees with an administrative decision, complaints about Ofgem's administration of the scheme go to feedback@ofgem.gov.uk, and general enquiries go to BUS.Enquiry@ofgem.gov.uk6.
The published grant figure is not consistent across documents. The scheme rules state grants of up to £7,500, while other official guidance gives £5,0005.
If something goes wrong: redress and Trading Standards
Redress in England runs along several tracks, and which one applies depends on the registration the installer holds. Where the installer is a member of a competent person scheme, the scheme itself is the first point of complaint, because the scheme is what allowed the work to be self-certified. Where the installer is MCS certified, the MCS Administrator can advise on making a complaint if the installer does not resolve it26. Where the installer is TrustMark registered, disputes go to disputes@trustmark.org.uk or through the online support form17.
For grant-funded work, the routes narrow. Only installers can ask Ofgem to review a Boiler Upgrade Scheme decision, so a householder who disagrees with an outcome has to work through the installer6. Complaints about the administration of the scheme itself go to Ofgem at feedback@ofgem.gov.uk6. The complaining about an installer page maps the full escalation sequence, and when an installer goes bust covers what happens when the company itself fails.
Trading Standards sits behind the voluntary codes rather than in front of them. It deals with breaches of consumer protection law, including mis-selling and false claims about registration, rather than with workmanship disputes, which are civil matters between the householder and the trader. The mis-selling and doorstep sales page covers the conduct issues that fall to Trading Standards, and consumer rights for installation work covers the statutory remedies for faulty work.
Northern Ireland has a distinct enforcement mechanism. Under Article 27, a distributor may issue a notice in writing requiring remedial works where it is not satisfied that a connected or proposed connection is constructed, installed, protected, used or arranged for use to prevent, so far as is reasonably practicable, danger or interference30. That applies to a consumer's installation, another distributor's network or a street electrical fixture30.
What this means for a household's energy independence

Registration and notification are not paperwork for its own sake. They determine whether an installation is legally complete, whether it can be funded, and whether there is anyone to complain to when it fails. A household that uses a registered competent person gets self-certification, a compliance certificate and a scheme complaint route. A household that does not gets a notification fee, a building control application and, if the work is wrong, a civil claim against a trader with no scheme behind it.
The dependence that remains is structural. The Boiler Upgrade Scheme is installer-led, so the grant, the voucher and any review request all pass through a company the household does not control5. MCS certification is a condition of funding, so the choice of installer is constrained by a certification the household cannot grant5. TrustMark registration is a condition of certain funded measures, so the register is not merely advisory15. And the building regulations themselves are enforced by local authorities, not by the household.
What a household can control is verification before signing. Checking registration against the relevant scheme, confirming the certificate that will be issued at the end, and keeping the documentation that an audit may later request are the steps that keep an installation inside the system rather than outside it. The home energy installers and retailers guide covers the full sequence from shortlisting to complaint.
Sources30 cited
- Use a competent person scheme, GOV.UK, 2026-09-17
- Approved Document L, Conservation of fuel and power, Volume 1: Dwellings, HM Government, 2023
- Building regulations: boilers and heating, Welsh Government, 2026-09-17
- Building regulations: competent person schemes, GOV.UK, 2026-09-17
- Boiler Upgrade Scheme, GOV.UK Find a Grant, 2026-09-18
- Boiler Upgrade Scheme guidance for property owners V5, Ofgem, 2026-04-28
- Boiler Upgrade Scheme guidance for installers v5.1, Ofgem, 2026-07-02
- Don't die for DIY, Electrical Safety First, 2026-09-19
- Solar photovoltaics and planning in conservation areas, West Suffolk Council, 2026-09-17
- Research briefing: TrustMark and builder registration, House of Commons Library, 2024-03-07
- Get a grant or loan to improve your home energy efficiency, Bristol City Council, 2026
- Building regulations and electrical works, Richmond Council, 2026-06-02
- Building regulations: doors and windows, Welsh Government, 2026-09-17
- Building control application guidance notes, Bromley Council, 2026-09-17
- Warm Home Discount (England and Wales) Regulations 2026, legislation.gov.uk, 2026-03-27
- ECO4 delivery guidance version 4.0, Ofgem, 2026-03-26
- Support for householders impacted by the closure of the Energy Company Obligation scheme, Welsh Government, 2026-03-13
- Approved Document L, Volume 1: Dwellings, HM Government, 2026
- Electric vehicle chargers, Planning Portal, 2026
- Electrical safety, Cumberland Council, 2026-09-17
- Stove guidance for householders, Building Control Northern Ireland, 2015-11
- Do I need building regulations approval for electrical work, Planning Portal, 2026
- Building regulations: electrics, Welsh Government, 2026-09-17
- Building regulations: renewables guidance, Bedford Borough Council, 2026-09-17
- Boiler Upgrade Scheme guidance for property owners v5.1, Ofgem, 2026-07
- Dispute resolution, Ofgem, 2026-09-17
- Solar panels, London Borough of Hammersmith and Fulham, 2026-09-17
- Boiler Upgrade Scheme quarterly report issue 14, Ofgem, 2025-11-26
- What you can get under the Boiler Upgrade Scheme, GOV.UK, 2026-09-17
- Electricity (Northern Ireland) Order 2012, Article 27, legislation.gov.uk, 2026-09-17

Installer in Northern IrelandHow do you check an installer in Northern Ireland is properly registered, and who do you complain to if the work goes wrong?
Using an Installer in WalesExplains how installer registration, competent person schemes and building control notification apply in Wales and where Welsh rules diverge.
Checking an InstallerBefore you sign anything, how do you know your installer is genuine?
The Full Installers GuideHow do you find an installer you can trust, and what should you check before signing anything?
Finding an Insulation InstallerHow to find, verify and check an insulation, glazing or ventilation installer in the UK: the registration schemes, trade bodies and guarantee arrangements that cover the work, how to compare quotes, what a written specification should state, and how complaints and disputes are handled.
Installer ReviewsCheck whether an installer is signed up to a scheme like MCS or TrustMark before you trust their star rating.