In this comparison
  1. What Each Scheme Offers
  2. Specifications and Requirements
  3. Eligibility and Who Qualifies
  4. Warranty Coverage
  5. Costs and Grant Coverage
  6. Company Status
  7. Energy Independence Impact

A heat pump can be funded through the Boiler Upgrade Scheme or through ECO4, but not through both for the same installation. Ofgem guidance states that funding from the two schemes cannot be blended for the same measure or included within an ECO4 project1. The choice is therefore a real one, and it turns on where the property is, who lives in it, what heating it replaces and whether the household qualifies for supplier-funded work at all.

The Boiler Upgrade Scheme is the simpler of the two. It pays a fixed upfront capital grant towards an approved heat pump, is administered by Ofgem, and covers England and Wales only2. The standard grant is £7,500 for air-to-water and ground source heat pumps, and £2,500 for air-to-air systems3. From 21 July 2026, eligible off-gas grid properties replacing oil or LPG heating can apply for an uplifted grant of £9,000, in place until 31 March 20272.

ECO4 works differently. It is not a grant scheme in the ordinary sense: it is the energy supplier that decides which retrofit projects to fund, and the funding is limited4. It runs until 31 December 2026 following a nine-month extension, and some councils already state that the grant is closed in their area5. ECO4 delivers to homes in Great Britain, so it covers England, Scotland and Wales but not Northern Ireland7.

What each scheme offers a UK household

The Boiler Upgrade Scheme exists to make low carbon heating more affordable by offering upfront grants, and it supports heat pumps and, in limited circumstances, biomass boilers9. It launched on 23 May 2022 and provides upfront capital grants towards the cost of installing approved heat pumps10. Applications go to Ofgem as scheme administrator, and the scheme has been extended to 20302. The published closing date for applications is 30 December 2029 at 11:59pm11.

ECO4 is the fourth Energy Company Obligation and is administered by Ofgem12. It funds energy efficiency measures such as heating improvements and insulation, and its measures include insulation, boilers and central heating, and solar and renewable technologies4. It was launched in 2022 and delivers energy efficiency and heating measures to homes in Great Britain7. The scheme is worth £4 billion8.

The two schemes answer different questions. The Boiler Upgrade Scheme asks whether a property has a suitable heat pump installation and a previous heating system worth replacing. ECO4 asks whether a household qualifies under one of its eligibility routes and whether a supplier chooses to fund the work. That difference explains why a household can be eligible for one and not the other, and why the two are kept apart in the rules.

An air source heat pump unit installed on the exterior brick wall of a house beside a window and garden plants
An air source heat pump unit installed on the exterior brick wall of a house beside a window and garden plants. Image: Aira

Specifications: what each scheme requires

An air source heat pump outdoor unit mounted on concrete blocks against a white wall
An air source heat pump unit outside a house Image: enphase.com

The Boiler Upgrade Scheme sets technical conditions that are published and checkable in advance. Eligible technologies are air-to-water heat pumps, air-to-air heat pumps, ground source heat pumps including water source heat pumps and shared ground loops, and biomass boilers2. Air-to-water and ground source heat pumps must achieve an in situ seasonal coefficient of performance of at least 2.82. Capacity limits are 45 kWth for an individual heat pump system, 70 kWth for a multi heat pump system, and 300 kWth total for shared ground loop systems, with each connected heat pump not exceeding 45 kWth2. Biomass boilers are capped at 45 kWth, may only be installed in rural areas, and must meet emissions limits of 30g/GJ net heat input for particulate matter and 150 g/GJ for NOx2.

All heating systems installed under the scheme must meet the relevant MCS standards approved and published by the Secretary of State2. The previous heating system being replaced must have been a fossil fuel-based system or an electric heating system that does not include a heat pump2. From 28 April 2026, BUS heat pumps can be installed alongside supplementary heating appliances, provided those appliances are not fossil fuel based2. Hybrid heat pump systems, such as a gas boiler combined with an air source heat pump, cannot receive a grant15.

ECO4's specifications are set out in delivery guidance rather than in a single eligibility page. The current delivery guidance is version 4.0, dated 26 March 202616. One technical distinction matters for heat pumps: an air-to-air system is not considered to be a renewable system in ECO410. That places air-to-air heat pumps outside the renewable measures ECO4 recognises, even though the Boiler Upgrade Scheme pays £2,500 towards them.

FeatureBoiler Upgrade SchemeECO4
AdministratorOfgem11Ofgem12
Territorial extentEngland and Wales2Great Britain7
Air-to-water heat pump£7,500, or £9,000 off-gas uplift2Funded as a heating or renewable measure13
Air-to-air heat pump£2,5003Not considered a renewable system10
Ground source heat pump£7,500, or £9,000 off-gas uplift2Funded as a renewable measure13
Minimum performanceSCOP of at least 2.82Set by delivery guidance16
Hybrid systemsNo grant available15Not a recognised renewable route10

Eligibility: who qualifies for which

Boiler Upgrade Scheme eligibility is property-based. New build properties which the developer is still building are not eligible, though a household moving into a finished new build with a fossil fuel boiler may be able to get a grant for a heat pump17. Properties classed as social housing are not eligible, and this includes shared ownership properties6. A property will not be eligible if a previous BUS grant has already been received for installing a heat pump or biomass boiler at the same address, and only one voucher can be redeemed per property2. Self-build properties are only eligible for heat pumps, not biomass2. From 28 April 2026, properties are no longer required to have a valid EPC to apply2.

ECO4 eligibility runs through defined routes: the Help to Heat Group, Social Housing, LA Flex, In-Fill and Supplier Flex11. Housing Benefit is a qualifying benefit under the Affordable Warmth route19. Because ECO4 is not a grant scheme in the ordinary sense, meeting an eligibility route does not guarantee funding: it is the energy provider's decision which retrofit projects to fund4. Funding for ECO4 is limited and was reported close to being fully allocated4.

The practical consequence is that a household on a low income in an inefficient property may find ECO4 covers more of the work, including insulation alongside heating, while a household outside the qualifying benefits that can afford the upfront cost of a heat pump will find the Boiler Upgrade Scheme more predictable. The two cannot be stacked, so the decision is made once per installation.

What the warranty covers

Warranty protection differs between the two routes, and the difference is worth understanding before work begins. Under ECO4 Flex, households are advised that if a contractor offers guarantees or warranties, they should obtain those documents after the installation21. The same guidance advises checking whether the installer is Gas Safe registered to work on gas boilers21.

A parliamentary debate on 17 June 2026 recorded that the cost of damage from faulty ECO4 and GBIS solid wall insulation can exceed the £20,000 limit covered by a valid guarantee22. That figure is a limit on guarantee cover, not a promise of payment, and it indicates the scale of remedial work that can arise when insulation is installed badly.

The Boiler Upgrade Scheme takes a different approach. Because all heating systems installed under the scheme must meet MCS standards approved and published by the Secretary of State, the installation falls within the MCS consumer protection framework rather than a scheme-specific guarantee2. The grant itself is protected at the point of sale: installers must deduct the full BUS grant value from the quote before any payment is made by the property owner2. That rule prevents a household paying the full price and waiting to be reimbursed.

One further protection sits in the ECO4 rules. Where a boiler or electric storage heater is replaced with an air source heat pump or district heating system and the new heating system is not of the same kind, the replacement does not count towards the ECO4 cap23. That matters for households weighing whether a heat pump can be delivered within the scheme's limits.

A technician working on the open control panel of an air source heat pump unit installed outside a brick house
A technician working on the open control panel of an air source heat pump unit installed outside a brick house. Image: imsheatpumps.co.uk

What it costs, and what the grant actually covers

An outdoor grey heat pump unit installed in a garden on a gravel bed beside a hedge
A heat pump installed at a home Image: idm-energie.at

The Boiler Upgrade Scheme grant values are fixed and published. Air-to-water heat pumps and ground source heat pumps attract £7,500, and air-to-air heat pumps attract £2,5003. Exhaust air-to-water heat pumps are eligible for the £7,500 grant2. From 21 July 2026, eligible off-gas grid properties with an air-to-water or ground source heat pump can apply for an uplifted grant of £9,000, and that uplifted value is in place until 31 March 20272. The uplift applies where the previous heating system being replaced was fuelled by oil or liquefied petroleum gas2.

The grant history explains some of the confusion around figures. From 23 October 2023, the grant level for air source and ground source heat pumps increased from £5,000 and £6,000 respectively to £7,50024. Older guidance still in circulation quotes the earlier £5,000 and £6,000 values25. Where a household sees a lower figure, it is likely to predate October 2023.

The scheme's budget rules matter for timing. Unspent budget is not carried over to the next scheme year, so a grant voucher has to be used within its validity period26. The BUS grant application has two stages, a voucher application and a voucher redemption application, and the application must be properly made within 120 days of the commissioning date2. Voucher validity periods are three months for air-to-water and air-to-air heat pumps and six months for ground source heat pumps3.

ECO4 does not publish a grant amount in the same way, because it is not a grant scheme. The scheme is worth £4 billion overall, and the funding is limited and was reported close to being fully allocated4. Prices for the work itself are installer-quoted under both routes, and no published price list applies.

The company's status: where each scheme stands

The Boiler Upgrade Scheme is active and has been extended. As of 28 April 2026, the scheme has been extended to 2030, and the published closing date for applications is 30 December 2029 at 11:59pm2. Applications properly made on or after 28 April 2026 fall under the current rules, and the uplifted grant for eligible off-gas grid properties applies to applications made on or after 21 July 20262. The scheme is open to domestic and small non-domestic properties27.

ECO4 is in its final period. It will run until 31 December 2026, following a nine-month extension5. Government guidance refers to the ending of funding for the Energy Company Obligation scheme28. Some councils already state that the grant is currently closed in their area6. Supplier notification deadlines under the scheme ran from August 2022 through to 1 February 2024, so the supplier obligations were set well before the current delivery period29.

The two schemes therefore sit at different points in their lifecycles. A household applying for the Boiler Upgrade Scheme is applying to a scheme with a published end date in 2029 and an extension to 2030. A household pursuing ECO4 is working within a scheme that closes at the end of 2026, with limited funding and local variation in whether work is still being commissioned.

What it means for household energy independence

A cutaway view of a house roof space where a small isometric installer in plain clothing kneels between the joists, unrolling a thick blanket of loft insulation across the loft floor, with the insulated area shown in a warm colour and the unfinished area bare beside them.
Loft insulation fitted in a home

Both schemes move a household away from gas dependence, but they do so to different degrees and with different residual ties. A Boiler Upgrade Scheme heat pump replaces a fossil fuel or electric heating system and runs on electricity, so the household remains connected to the grid and to an electricity supplier2. What changes is the fuel: the home no longer depends on the gas network for heat, and the grant is deducted from the quote upfront, so the household is not carrying the grant as a debt2.

ECO4 delivers insulation alongside heating measures, which reduces the total energy a home needs rather than only changing the fuel it uses13. That is a deeper form of independence, because a well-insulated home is less exposed to price movements whatever the heat source. The trade-off is control: ECO4 is not a grant scheme, and it is the energy provider's decision which retrofit projects to fund4. A household cannot apply for ECO4 in the way it applies for a Boiler Upgrade Scheme voucher.

Neither scheme removes dependence on the grid or on a supplier. A heat pump needs electricity, and a household with a heat pump and no solar or battery remains exposed to electricity prices in the same way a gas household is exposed to gas prices. The schemes change which network a home depends on, and in ECO4's case how much energy it needs in the first place.

The schemes also differ in how long the support lasts. The Boiler Upgrade Scheme has a published closing date of 30 December 2029 and an extension to 20302. ECO4 closes on 31 December 20265. For a household planning work over several years, that timing shapes which route is realistically available.

For the wider picture of how grants fit together, the full guide to home energy grants and schemes sets out the current landscape, and the Boiler Upgrade Scheme and ECO4 pages cover each route in detail. Households weighing the two directly can read the comparison of the Boiler Upgrade Scheme and ECO4, and those checking whether a heat pump qualifies under ECO4 can read ECO4 heat pump funding. The rule that prevents stacking is set out in ECO4 and other grants.

Sources29 cited
  1. ECO4 delivery guidance, Ofgem, 2025-12-03
  2. Boiler Upgrade Scheme guidance for installers v5.1, Ofgem, 2026-07-01
  3. Boiler Upgrade Scheme guidance for installers V5, Ofgem, 2026-04-24
  4. ECO4 scheme, Ofgem, 2026-09-17
  5. ECO4 and ECO Flexible Eligibility, Breckland Council, 2026-09-17
  6. ECO4 scheme, West Lindsey District Council, 2025-07
  7. Energy Company Obligation ECO4 guidance 2022 to 2026, Department for Energy Security and Net Zero, 2022-07
  8. Design of the Energy Company Obligation ECO4 2022 to 2026, Department for Energy Security and Net Zero, 2021-07-20
  9. Domestic Renewable Heat Incentive annual report, scheme year 11, Ofgem, 2025-07
  10. ECO4 new measures and products guidance v3.0, Ofgem, 2026-03
  11. Boiler Upgrade Scheme, Find Government Grants, 2026-09-18
  12. ECO4 is administered by Ofgem, Bridgend County Borough Council, 2026-09-17
  13. Energy Company Obligation ECO4, Leeds City Council, 2026-09-20
  14. ECO4 Flex and GBIS Flex information document, Ceredigion County Council, 2025-11
  15. What you can get, GOV.UK, 2026-09-17
  16. Summary of updates to ECO4 delivery guidance and measures table, Ofgem, 2026-03-26
  17. Check if you're eligible, GOV.UK, 2026-09-17
  18. ECO4 eligibility requirements form v1.0, Ofgem, 2022-10
  19. ECO4 GBIS eligibility and pre-installation declaration v1.1, Ofgem, 2026-01
  20. Energy Company Obligation: homeowners and tenants, Ofgem, 2026-09-17
  21. ECO4 Flex open, South Cambridgeshire District Council, 2026-09-17
  22. Energy market consumer protection debate, Hansard, 2026-06-17
  23. Energy Company Obligation ECO4 interim delivery guidance v1.1, Ofgem, 2023-02-14
  24. Boiler Upgrade Scheme quarterly report issue 12, Ofgem, 2025-05
  25. Boiler Upgrade Scheme guidance for installers v2.1, Ofgem, 2023-05-18
  26. Boiler Upgrade Scheme quarterly report issue 14, Ofgem, 2025-11-26
  27. Home and business grants, schemes and advice, East Herts Council, 2026-09-17
  28. Domestic energy tariff reductions 2026: guidance for energy suppliers, Department for Energy Security and Net Zero, 2026-03-18
  29. ECO4 guidance on supplier administration, Ofgem, 2026-07-06

Questions

Answers here, and more on their own pages.

Can I use the Boiler Upgrade Scheme and ECO4 together for one heat pump?

No. Ofgem guidance is explicit that funding from the Boiler Upgrade Scheme and ECO4 cannot be blended for the same measure or included within an ECO4 project. The same rule bars combining ECO4 funding with the Warm Home Discount, the Social Housing Decarbonisation Fund and the Home Upgrade Grant. A household chooses one route for a given installation.

How much does the Boiler Upgrade Scheme pay towards a heat pump?

The standard grant is £7,500 for air-to-water and ground source heat pumps, and £2,500 for air-to-air heat pumps. From 21 July 2026, eligible off-gas grid properties replacing oil or LPG heating can apply for an uplifted grant of £9,000, available until 31 March 2027. Installers must deduct the full grant from the quote before any payment is made.

Is ECO4 still open for heat pump funding?

ECO4 runs until 31 December 2026 following a nine-month extension, and Ofgem lists it as the current Energy Company Obligation scheme. Funding is limited and was reported close to fully allocated. Some councils already state the grant is closed in their area. ECO4 is not a grant scheme in the ordinary sense: it is the energy supplier that decides which projects to fund.

Does ECO4 cover air source heat pumps?

ECO4 funds heating improvements and insulation, and its measures include boilers, central heating and renewable technologies. Air-to-air heat pumps are not treated as a renewable system under ECO4. The scheme is delivered through routes including the Help to Heat Group, Social Housing, LA Flex, In-Fill and Supplier Flex, and eligibility depends on benefits, tenure and property condition.

Which scheme covers Scotland and Northern Ireland?

The Boiler Upgrade Scheme covers England and Wales only. ECO4 delivers to homes in Great Britain, so it covers England, Scotland and Wales but not Northern Ireland. Households in Scotland and Northern Ireland therefore look to devolved schemes rather than the Boiler Upgrade Scheme for heat pump funding.

Do I need an EPC to get the Boiler Upgrade Scheme grant?

No. From 28 April 2026, properties are no longer required to have a valid Energy Performance Certificate to apply for the Boiler Upgrade Scheme. The scheme has also been extended to 2030, and applications properly made on or after 28 April 2026 fall under the current rules. The grant must be applied for within 120 days of commissioning.

Can social housing get the Boiler Upgrade Scheme?

No. Properties classed as social housing are not eligible for Boiler Upgrade Scheme funding, and this includes shared ownership properties. Social housing is instead one of the eligibility routes within ECO4, alongside the Help to Heat Group, LA Flex, In-Fill and Supplier Flex. Only one voucher can be redeemed per property under the Boiler Upgrade Scheme.

What warranty protection applies to work funded by these schemes?

Under ECO4 Flex, households are advised to obtain any guarantees or warranties offered after installation. A parliamentary debate in June 2026 noted that the cost of damage from faulty ECO4 and GBIS solid wall insulation can exceed the £20,000 limit covered by a valid guarantee. The Boiler Upgrade Scheme requires installations to meet MCS standards, which carry their own consumer protection.

Do hybrid heat pumps qualify for the Boiler Upgrade Scheme?Do I qualify for ECO4 funding for a heat pump?Why air-to-air heat pumps do not get the Boiler Upgrade Scheme grantCan I get a free boiler grant under ECO4?How much does a heat pump cost with a Boiler Upgrade Scheme grant?Can ECO4 measures be funded with other government grants?