Boiler Upgrade Scheme vs ECO4: which grant is right for your home?

Can I get money off a new boiler? Does my home qualify, and what if I rent? What does each grant actually pay for, and what is left for me to cover?

Boiler grants differ in who they help and what they cover, so compare the Boiler Upgrade Scheme with ECO4, check your home and benefits against each, and weigh up the costs, the paperwork and what you still pay for afterwards.

A small model of an air source heat pump stands on one side of a table beside a roll of loft insulation, with blank application paperwork, a plain envelope and a few coins arranged between them, showing a household choosing between two separate funding routes.
In this comparison
  1. What Each Scheme Offers
  2. What Each Scheme Funds
  3. Eligibility for Each Scheme
  4. Grant Amounts and Costs
  5. Applying and Warranty Position
  6. Scheme Status and Administration
  7. Energy Independence Impact

The Boiler Upgrade Scheme and ECO4 are the two main funded routes to a warmer, cheaper-to-run home in Great Britain, and they do different jobs. The Boiler Upgrade Scheme pays upfront capital grants of up to £7,500 towards a heat pump, and £5,000 towards a biomass boiler, in England and Wales only1. ECO4 is a supplier-funded obligation worth £4 billion that delivers insulation and heating measures to homes in Great Britain, aimed at low income, vulnerable and fuel poor households2.

The single most important rule is that they cannot be combined. Funding from the Boiler Upgrade Scheme and ECO4 cannot be blended for the same measure or included within an ECO4 project4. A household therefore picks one route for a given measure: a heat pump through the Boiler Upgrade Scheme, or a boiler, central heating or insulation package through ECO4.

The two also run on different clocks. ECO4 is due to end on 31 March 20265, while the Boiler Upgrade Scheme has a published closing date of 30 December 2029 and installer guidance stating it has been extended to 20301. Which scheme fits a home depends less on preference than on tenure, fuel, EPC and whether the household meets ECO4's low income and vulnerability tests.

What each scheme offers in the UK

ECO4 is the fourth iteration of the Energy Company Obligation, which began in January 2013 and is currently in its latest form8. It is worth £4 billion and delivers energy efficiency and heating measures to homes in Great Britain2. Its stated objective is to reduce fuel poverty by improving the least energy efficient housing stock occupied by low income, vulnerable and fuel poor households, and it works through whole house retrofits rather than single measures9.

The Boiler Upgrade Scheme is a different instrument entirely. It came into force on 1 April 2022 and launched on 23 May 2022, providing upfront capital grants towards approved heat pumps and biomass boilers in England and Wales10. Ofgem administers it on behalf of the Gas and Electricity Markets Authority12. It is a cash contribution to a single installation, not a whole house programme, and it carries no income test.

That difference in design explains most of what follows. ECO4 is means-tested and measure-rich; the Boiler Upgrade Scheme is universal within its territory but narrow in what it will pay for. A household on a low income with a poor EPC and an old boiler is squarely in ECO4 territory. A household that can fund most of a heat pump and wants the capital contribution is in Boiler Upgrade Scheme territory. The two overlap only in the sense that both can improve a home's energy position, never in the same project.

For the wider landscape of funded routes, including devolved schemes, see home energy grants.

What each scheme will and will not fund

ECO4's measure list is broad. It covers boiler upgrades to non-renewable and renewable heating systems, repair of a broken heating system, replacement of a broken efficient heating system, first time central heating, electric storage heater upgrades and repairs or replacement, connection to a district heating system, heating controls, solar PV, wall, roof, floor and loft insulation, draught proofing, window glazing and higher performance external doors13.

The Boiler Upgrade Scheme funds a much shorter list: air-to-water heat pumps, air-to-air heat pumps, ground source heat pumps including water source heat pumps and shared ground loops, and biomass boilers6. Hybrid systems are excluded, and no grant is available for a hybrid heat pump system such as a combination of gas boiler and air source heat pump14.

Boiler Upgrade SchemeECO4
InsulationNot fundedWall, roof, floor, loft, draught proofing, glazing, doors13
Gas boiler replacementNot fundedBoiler upgrade, repair or replacement of a broken efficient system13
Heat pumpAir-to-water, air-to-air, ground source, shared ground loops6Renewable heating measures within a whole house project13
Solar PVNot fundedFunded13
Hybrid heat pumpExcluded14Not a listed measure13
District heating connectionNot fundedFunded13
A split diagram showing two simplified houses side by side: on the left an air source heat pump mounted on the outside wall funded by the Boiler Upgrade Scheme, and on the right an ECO4 whole house retrofit with thick loft insulation, insulated walls and rooftop solar panels.
The two schemes fund different things: a single low carbon heating installation against a package of fabric and heating measures. Image: Illustration

Eligibility: who each scheme is built for

A simplified isometric house with an energy performance certificate document shown as a physical paper sheet pinned to a notice board in its hallway, its rating bands drawn as plain colour blocks with blank lines instead of any readable words or numbers.
An energy performance certificate for a house

ECO4 is aimed at households in fuel poverty or at risk of it, and delivery runs through energy suppliers and their installers rather than direct application9. Property conditions matter. Where the existing EPC is a D or E it must be able to be improved to a C, and where it is an F or G it needs to be able to be improved to a D15. Private rented sector properties face a specific restriction: the replacement, upgrade or repair of a boiler, central heating system or electric storage heater is generally not eligible, except where the replacement is first time central heating, a renewable heating measure or a district heating connection16.

The Boiler Upgrade Scheme has no income test but a set of technical and property conditions. The property must be in England or Wales, must not be social housing, and the installation must replace an existing fossil fuel or electric heating system18. The previous system must have been a fossil fuel based system or an electric heating system that does not include a heat pump6. Self-build properties qualify for heat pumps only, not biomass6. Capacity limits apply: 45 kWth for an individual heat pump system, 70 kWth for a multi heat pump system, and 300 kWth total for shared ground loop systems with each connected heat pump not exceeding 45 kWth6.

One condition has changed recently and is worth stating plainly, because older pages still carry the old rule. From 28 April 2026, properties are no longer required to have a valid EPC to apply for the Boiler Upgrade Scheme6. Government scheme pages still list a valid energy performance certificate as a requirement1, so the two positions differ; the newer Ofgem installer guidance reflects the current position. Eligibility detail sits on Boiler Upgrade Scheme eligibility and ECO4 eligibility.

Grant amounts and what each scheme costs

The Boiler Upgrade Scheme's headline figures are straightforward. The standard grant is £7,500 off the cost and installation of an air source heat pump, and £5,000 off a biomass boiler1. From 21 July 2026, eligible off gas grid properties replacing oil or liquefied petroleum gas heating can apply for an uplifted grant of £9,000 for an air-to-water or ground source heat pump6. That uplift is in place until 31 March 20276. Properties that do not qualify for the uplift may still be eligible for a grant of £7,5006.

The scheme's budget is finite and does not roll forward. Scheme Year 4, running from April 2025 to March 2026, had a budget of £295,000,000, of which £185,500,000 was spent and £109,500,000 remained as at the November 2025 report20. By the February 2026 report the position had moved to £244,337,500 spent and £50,662,500 remaining21, and the monthly update recorded £232,720,000 spent in Year 422. Unspent budget is not carried over to the next scheme year20. The scheme had an initial budget of £150m per financial year for 2022-20256.

ECO4 does not publish a per-household grant in the same way, because it is an obligation on suppliers rather than a voucher. Its scale is set by the £4 billion scheme value and the target of upgrading 450,000 homes over four years3. One specific cap exists: a broken boiler and electric storage heating replacement cap for efficient heating of 5,000 per year3. Where no published price exists for a measure, costs are installer-quoted.

"Installers must deduct the full BUS grant value from the quote before any payment is made by the property owner."
Ofgem, Boiler Upgrade Scheme installer guidance6

How the application and warranty position works

An isometric installer figure at a desk in a home office, submitting a voucher application on a laptop screen shown as plain blank fields, with a heat pump installation folder of documents beside them and a small MCS certification plaque on the desk, representing the installer's role in the two-stage application process.
An installer applying for a scheme voucher

The Boiler Upgrade Scheme application is a two-stage process: the installer submits a voucher application, Ofgem issues a voucher, the installer submits a voucher redemption application, and the installer receives the grant payment20. A voucher application is only considered properly made once Ofgem has all the necessary information to assess eligibility and the property owner has provided consent and identity verification12. The application must be properly made within 120 days of the commissioning date6. Only one voucher can be redeemed per property, and a property is not eligible if a previous Boiler Upgrade Scheme grant has already been received for a heat pump or biomass boiler at the same address6.

Installers carry the compliance burden. All Boiler Upgrade Scheme installations must be MCS certified10, and all heating systems installed under the scheme must meet the relevant MCS standards approved and published by the Secretary of State6. Installers must keep all documentation relied upon in voucher and redemption applications for six years from the date the application was properly made6. Ofgem can conduct site or desk audits at any point after an application, including after grant payment18.

On warranty, the position differs by scheme. ECO4 guidance covers blended funding with the Boiler Upgrade Scheme, which is the administrative treatment of the two schemes meeting, not a warranty in itself24. The Boiler Upgrade Scheme does not warrant the installation; the grant is a capital contribution and the workmanship and product guarantees come from the installer and manufacturer. Heat pumps funded under the scheme must achieve an in situ seasonal coefficient of performance of at least 2.86, which is a performance condition rather than a warranty term. For the application sequence in detail, see applying for the Boiler Upgrade Scheme.

Scheme status and administration

Both schemes are live, administered by public bodies, and neither depends on a private company's solvency. Ofgem administers the Boiler Upgrade Scheme on behalf of the Gas and Electricity Markets Authority12, and publishes quarterly and annual reports on its website plus monthly operational updates6. The most recent quarterly report covers 1 May 2026 to 31 July 202625. Enquiries go to the BUS Enquiries team at BUS.Enquiry@ofgem.gov.uk or by phone on 0330 053 20066.

ECO4 sits with the Department for Energy Security and Net Zero and is delivered through obligated energy suppliers, with Ofgem publishing delivery guidance that has been revised repeatedly, most recently in March 202616. Supplier administration guidance exists for the failure of an obligated supplier, which is the structural risk in a supplier-delivered scheme rather than a scheme-level one27.

The timetable is the live issue. ECO4 is due to end on 31 March 20265, and government guidance refers to the ending of funding for the Energy Company Obligation scheme19. The Boiler Upgrade Scheme has a published closing date of 30 December 20291, and installer guidance states that as of 28 April 2026 the scheme has been extended to 20306. The two do not expire together, and a household weighing them should treat ECO4 as the time-limited route.

A laptop on a home table showing a statistics dashboard webpage with plain bar charts and colour blocks tracking two schemes' delivery figures, with a printed quarterly report sheet beside it.
Both schemes publish delivery data, which is how budget exhaustion and uptake can be tracked before applying. Image: Illustration

What each scheme means for energy independence

ECO4's contribution to independence is fabric and system first. By funding wall, roof, floor and loft insulation, draught proofing, glazing and doors alongside heating measures, it reduces the energy a home needs before it addresses where that energy comes from13. Its whole house retrofit approach is designed to lift the least efficient homes, which are also the most exposed to price movements9. That is a reduction in demand, and demand reduction is the most durable form of independence because it does not depend on a fuel source, a supplier or a tariff.

The Boiler Upgrade Scheme's contribution is different: it moves the heating load off fossil fuel and onto electricity, and it does so at the point of replacement. A heat pump funded under the scheme replaces a fossil fuel or electric heating system18, which removes gas or oil from the property's direct consumption. What remains is dependence on the electricity grid and on a supplier, plus the manufacturer's company for parts and the installer for service. The scheme does not fund a battery or solar PV, so a heat pump household without those remains fully grid-dependent for its heating.

Neither scheme delivers full independence on its own. ECO4 can leave a home still heated by gas, simply using less of it. The Boiler Upgrade Scheme can leave a home electrified but still buying every unit from the grid. The combination that most reduces dependence, fabric first and then a heat pump, cannot be funded by blending the two schemes for the same measure4, so households sequence them instead. For how these routes fit the wider picture, see grants and energy independence.

Sources27 cited
  1. Boiler Upgrade Scheme grant summary, Find Government Grants, 2026-09-18
  2. Energy Company Obligation ECO guidance 2022-2026, Department for Energy Security and Net Zero, 2022-07
  3. Design of the Energy Company Obligation ECO4 2022-2026, Department for Energy Security and Net Zero, 2021-07-20
  4. ECO4 delivery guidance v3.2, Ofgem, 2025-12-08
  5. ECO4 and Great British Insulation Scheme mid-scheme changes: final stage impact assessment, Department for Energy Security and Net Zero, 2025-04-07
  6. Boiler Upgrade Scheme guidance for installers v5.1, Ofgem, 2026-07-02
  7. British Energy Security Strategy, Department for Business, Energy and Industrial Strategy, 2022-04
  8. Heat pump deployment quarterly statistics, United Kingdom 2026 Q1, Department for Energy Security and Net Zero, 2025-09-04
  9. ECO4 Flex and GBIS Flex information document, Ceredigion County Council, 2025-11
  10. Boiler Upgrade Scheme statistics July 2026, Department for Energy Security and Net Zero, 2026-08-27
  11. Boiler Upgrade Scheme annual report April 2025 to March 2026, Ofgem, 2026-07-31
  12. Boiler Upgrade Scheme guidance for installers V5, Ofgem, 2026-04-28
  13. ECO4 delivery guidance version 4.0, Ofgem, 2026-03-26
  14. What you can get, Department for Energy Security and Net Zero, 2026-09-17
  15. ECO4 scheme, Derbyshire County Council, 2026-09-17
  16. ECO4 Delivery Guidance v1.1, Ofgem, 2023-02-03
  17. Energy Company Obligation ECO4 Guidance Delivery V1, Ofgem, 2022-10-14
  18. Boiler Upgrade Scheme: installers, Ofgem, 2026-09-17
  19. Domestic energy tariff reductions 2026: guidance for energy suppliers, Department for Energy Security and Net Zero, 2026-03-18
  20. Boiler Upgrade Scheme quarterly report issue 14, Ofgem, 2025-11-26
  21. Boiler Upgrade Scheme quarterly report issue 15, Ofgem, 2026-02-27
  22. Boiler Upgrade Scheme monthly scheme update, Ofgem, 2026-01-12
  23. Boiler Upgrade Scheme quarterly report issue 13, Ofgem, 2025-08-29
  24. ECO4 summary updates document, Ofgem, 2026-09-17
  25. Boiler Upgrade Scheme quarterly report issue 17, Ofgem, 2026-08-31
  26. Boiler Upgrade Scheme guidance for property owners V5, Ofgem, 2026-04-28
  27. ECO4 supplier administration guidance, Ofgem, 2026-07-06

Questions

Answers here, and more on their own pages.

Can I use the Boiler Upgrade Scheme and ECO4 together?

No. Funding from the Boiler Upgrade Scheme and ECO4 cannot be blended for the same measure, and BUS funding cannot be included within an ECO4 project. The two routes are alternatives for any single measure, so a household chooses one or the other for a heat pump, a boiler or a piece of insulation rather than stacking them.

Does the Boiler Upgrade Scheme cover a gas boiler?

No. The Boiler Upgrade Scheme pays towards low carbon heating, principally air source and ground source heat pumps and biomass boilers. The installation must replace an existing fossil fuel or electric heating system, so a like-for-like gas boiler swap is not a BUS measure. Gas boiler replacement sits within ECO4 instead, under its broken heating rules.

Do I need an EPC for the Boiler Upgrade Scheme?

Not since 28 April 2026. Ofgem guidance states that from that date properties are no longer required to have a valid energy performance certificate to apply for the Boiler Upgrade Scheme. Older government pages still list a valid EPC as a condition, so the two positions differ and the newer Ofgem installer guidance is the one that reflects the current rule.

How much is the Boiler Upgrade Scheme grant?

The standard grant is £7,500 towards an air source heat pump, and £5,000 towards a biomass boiler. From 21 July 2026, eligible off gas grid properties replacing oil or LPG heating can apply for an uplifted grant of £9,000 for an air to water or ground source heat pump. The uplift runs until 31 March 2027.

When does ECO4 end?

ECO4 is due to end on 31 March 2026, and government guidance refers to the ending of funding for the scheme. The Boiler Upgrade Scheme runs on a different timetable, with a published closing date of 30 December 2029 and installer guidance stating the scheme has been extended to 2030. The two schemes therefore do not expire together.

Who qualifies for ECO4?

ECO4 is aimed at low income, vulnerable and fuel poor households in Great Britain, and is delivered through energy suppliers and their installers. Properties with an EPC of D or E must be improvable to a C, and those at F or G must be improvable to a D. Private rented sector properties face restrictions on replacing an existing boiler.

Is the Boiler Upgrade Scheme available in Scotland and Northern Ireland?

No. The Boiler Upgrade Scheme covers England and Wales only. ECO4 operates across Great Britain, so it covers England, Scotland and Wales but not Northern Ireland. Households outside the Boiler Upgrade Scheme area look to devolved schemes instead, such as Home Energy Scotland or the Northern Ireland Sustainable Energy Programme.