Search

Green Deal vs Boiler Upgrade Scheme

Can I still get help if I had a Green Deal plan? Which grant is better for my home now? What happens to the money I still owe?

Compare the two schemes side by side, see what each one pays for, check what your home needs to qualify, and work out the costs left over after any grant.

A small model of an air source heat pump unit stands on a kitchen table beside blank application paperwork, a clipboard with a pen, and a long envelope marked only by a window showing a folded bill, with a few coins resting on the papers.
In this comparison
  1. What Each Scheme Offers
  2. What Qualifies and What Does Not
  3. Warranty and Consumer Protection
  4. Costs and Grant Exclusions
  5. Scheme Status and Administrators
  6. Household Energy Independence

The Green Deal and the Boiler Upgrade Scheme are not two versions of the same thing. The Green Deal was a pay-as-you-save financing mechanism, launched by the Coalition Government, that let private firms install energy efficiency measures at no upfront cost and recoup the money through a charge in instalments on the energy bill1. It is closed. The Boiler Upgrade Scheme is a live grant programme, administered by Ofgem, that provides upfront capital grants towards the cost of installing approved heat pumps and biomass boilers in England and Wales3.

For a householder with a legacy Green Deal plan, the practical question is not which scheme to choose. It is what the plan on the meter still costs, and whether the current grant can be used alongside it. The answer to the second part is no: the Boiler Upgrade Scheme grant is deducted from an installer's quote for a new heating system, not applied to an outstanding finance charge5.

The headline figures are these. The standard Boiler Upgrade Scheme grant is £7,500, and from 21 July 2026 eligible off-gas grid properties with an air-to-water or ground source heat pump can apply for an uplifted grant of £9,000, in place until 31 March 20276. Air-to-air heat pumps attract £2,500 and biomass boilers £5,0008. The scheme opened on 23 May 2022 and is scheduled to close at 11:59pm on 30 December 20299.

What each scheme offers in the UK

The Green Deal was a financing mechanism, not a grant. It enabled private firms to offer domestic and non-domestic consumers energy efficiency improvements at no upfront cost, recouped through a charge in instalments on the energy bill2. Under the legislation, an energy plan is a Green Deal plan if the improvements are paid for wholly or partly in instalments and all the conditions in section 1(4) are met, including eligible property, qualifying energy improvements, assessment conditions, plan terms conditions and a relevant energy supplier supplying energy to the property11. The charge stayed with the house on the energy meter, which is why a plan can outlive the householder who took it out.

The Boiler Upgrade Scheme works in the opposite direction. It provides grants to assist with installation costs, paid upfront and deducted from the installer's quote before the property owner pays anything1. It supports the decarbonisation of homes and small and medium non-domestic buildings in England and Wales, and covers air-to-water heat pumps, air-to-air heat pumps, ground source heat pumps including water source heat pumps and shared ground loops, and biomass boilers3.

The two schemes also differ in what they were for. The Green Deal funded fabric and efficiency measures broadly. The Boiler Upgrade Scheme funds a heating system replacement, and the installation must replace an existing fossil-fuel or electric heating system13. The previous system must have been a fossil fuel-based system or an electric heating system that does not include a heat pump14.

"A scheme that allows householders to improve the energy efficiency of their homes and repay the cost through energy bills"
Ofgem, energy terms explained2

Specifications: what qualifies and what does not

The Boiler Upgrade Scheme has a detailed specification regime, and the figures matter because they determine whether a voucher is issued at all. All heating systems installed under the scheme must meet the relevant MCS standards approved and published by the Secretary of State, and all installations must be MCS certified15. The installer must be certified by the Microgeneration Certification Scheme9.

SpecificationLimit or requirement
Individual heat pump capacity45 kWth maximum15
Multi heat pump system70 kWth maximum15
Shared ground loop system300 kWth total, each connected heat pump not exceeding 45 kWth15
Individual biomass boiler45 kWth maximum15
Heat pump efficiencyIn situ SCOP of at least 2.8 for air-to-water and ground source15
Biomass particulate matterNot exceeding 30g/GJ net heat input15
Biomass NOxNot exceeding 150 g/GJ net heat input15
Biomass locationRural areas only15

Air-to-air heat pumps are eligible for residential properties only, and only one voucher can be redeemed per property15. A property is not eligible if a previous Boiler Upgrade Scheme grant has already been received for installing a heat pump or biomass boiler at the same address15. Self-build properties are eligible for heat pumps only, not biomass15. Properties classed as social housing are not eligible, and that includes shared ownership properties13. New builds by developers are not eligible, though a householder moving into a finished new build with a fossil fuel boiler may be able to get a grant for a heat pump9.

The Green Deal's specification regime was different in kind. Its central constraint was the Golden Rule, under which savings figures were calculated, and the official position was that cost savings would vary depending on the actual amount of energy used to heat the property and the actual condition of the house before measures were installed17. That variability is the reason the scheme's modelled savings and real bills diverged.

An air source heat pump unit mounted on an outside house wall surrounded by climbing roses and garden plants
An air source heat pump unit mounted on an outside house wall surrounded by climbing roses and garden plants. Image: Nesta

What the warranty and consumer protection cover

A tidy office shelf where an installer keeps a labelled folder of heat pump installation paperwork, with a small isometric installer figure filing a document into it, ready for any Ofgem audit.
Installer keeps the scheme paperwork safely filed

Neither scheme is a warranty. The Boiler Upgrade Scheme provides a grant to help cover the costs of installing low carbon heating technologies, such as heat pumps, and the grant itself carries no product guarantee10. The warranty on the installed system comes from the manufacturer and the installer, and the scheme's protection takes a different form: Ofgem can conduct site or desk audits at any point after a Boiler Upgrade Scheme application, including after grant payment13. Installers are required to keep all documentation relied upon in voucher applications and voucher redemption applications for six years from the date the application was properly made15.

That audit power is the scheme's real compliance mechanism. A voucher application is only considered properly made once Ofgem has all the necessary information to assess eligibility, and the property owner has provided consent and identity verification14. The application has two stages, a voucher application and a voucher redemption application, and the application must be properly made within 120 days of the commissioning date15. Ofgem may grant an extension to the 120-day commissioning rule where the length of time taken to reach certain administrative decisions results, or is likely to result, in the 120-day period being exceeded for a re-application14.

For a legacy Green Deal plan, the consumer protection question is different again. The plan is a debt attached to the meter, and disputes about it sit with the energy supplier and the ombudsman rather than with any grant body. The Energy Ombudsman lists Energy Swap as an active participant in its dispute resolution service18. A householder who has inherited a plan should establish from the supplier what the outstanding balance is and how the charge appears on the bill.

What it costs, and what the grant does not cover

The Boiler Upgrade Scheme grant values are fixed and published. The standard grant is £7,500 for eligible properties that do not qualify for the uplifted rate15. From 21 July 2026, eligible off-gas grid properties can apply for an uplifted grant of £9,000 for an air-to-water heat pump or ground source heat pump, and that uplifted value is in place until 31 March 20277. The uplifted grant requires the property not to be fuelled by mains gas, and the heating system being replaced must be fuelled by oil or liquefied petroleum gas13. Air-to-air heat pumps attract £2,500 and biomass boilers £5,0008.

The scheme's own budget history explains why the values have moved. The Boiler Upgrade Scheme had an initial budget of £150m per financial year for 2022-202515. Unspent budget is not carried over to the next scheme year, so a slow year does not build a reserve for a busy one20. The scheme has been extended to 2030, and the guidance distinguishes applications properly made on or after 28 April 2026 from those made earlier15.

The Green Deal's cost model was the reverse of a grant. The householder paid nothing upfront and repaid the whole cost plus finance through the bill. The official consultation on the scheme noted that the potential £120 assessment fee meant the estimated £15 cost of having a cylinder jacket fitted was misleading, and that this was more likely to be problematic for homeowners having their boiler or windows replaced than for extensions and conversions5. That mismatch between headline measure cost and total household cost is the clearest single illustration of how the two schemes differ.

Prices for the underlying heating system are installer-quoted, and no published price range is available. The grant is a contribution to installation costs, not a fixed-price offer: the Boiler Upgrade Scheme provides upfront capital grants towards the cost of installing approved heat pumps15, and the full grant value must be deducted from the quote before any payment is made by the property owner15.

A householder seated at a kitchen table comparing an installer's heat pump quotation with grant paperwork, a pen in hand, with the quote showing a plain colour band representing the deducted grant portion above a shorter remaining balance line.
The grant is deducted from the installer's quote, so the householder never pays the grant portion and reclaims it. Image: Illustration

The status of each scheme and its administrator

The Green Deal is closed. It was launched by the previous Coalition Government to incentivise and help fund energy efficiency and renewable energy technologies for homes, and it no longer accepts new plans4. Existing plans remain live obligations on the properties that carry them.

The Boiler Upgrade Scheme is open and administered by Ofgem on behalf of the Gas and Electricity Markets Authority14. It opened on 23 May 2022 at 12:01am and is scheduled to close at 11:59pm on 30 December 20299. Ofgem guidance states the scheme has been extended to 203015. Ofgem is required to publish quarterly and annual reports on its website and aims to publish monthly operational updates15. The most recent quarterly report covers the period from 1 May 2026 to 31 July 202622.

There is a live question about installer certification. Ofgem guidance states that there are currently no schemes determined by the Energy Department to be equivalent to MCS23. A consultation on Boiler Upgrade Scheme and certification requirements for clean heat schemes has concluded24. The scheme's general enquiries line is BUS.Enquiry@ofgem.gov.uk or 0330 053 200615.

The scheme's scale has been questioned officially. A parliamentary committee assessment found that the scheme is not of the scale that is required to meet the Government's targets of decarbonising residential heat25. That is a statement about the programme's reach, not about any individual installation.

What it means for household energy independence

An outdoor air source heat pump unit with grille panels installed beside a brick house wall in a garden
Heat pump unit beside a brick house wall Image: Mitsubishi Electric Living Environmental Systems UK

The two schemes point in opposite directions on independence. The Green Deal financed efficiency measures and left the household repaying a charge on the energy bill, so the household's relationship with its supplier deepened rather than loosened. The charge stays with the meter, which means it transfers to whoever pays the bill at that property.

The Boiler Upgrade Scheme moves a household off a fossil fuel heating system, which is the dependence that matters most for a home without a mains gas connection. The uplifted £9,000 grant is specifically aimed at off-gas grid properties whose previous system was oil or LPG7. Replacing an oil boiler or an LPG system with a heat pump removes a delivered fuel dependency and shifts the household onto electricity, which can increasingly be met by on-site generation.

What remains is electricity. A heat pump household is still connected to the grid and still buys units from a supplier, and the scheme does not fund generation or storage. The grant also does not cover the full installed cost, so the household carries the balance. And the scheme is not available in Scotland or Northern Ireland, where separate national programmes apply10. For a household in England or Wales with a legacy Green Deal plan, the two things can coexist on the same property: the plan continues to be repaid through the bill while a new grant funds a different measure, provided the funding rules on blending are respected19.

Sources25 cited
  1. Parliamentary briefing on the Boiler Upgrade Scheme, UK Parliament, 2026
  2. Energy terms explained, Ofgem, 2026
  3. Boiler Upgrade Scheme, Ofgem, 2026
  4. Green Deal research briefing, House of Commons Library, 2018
  5. Minor consequential improvements to Part L of the Building Regulations, UK Parliament, 2012
  6. Notice of approved grant categories and values for the Boiler Upgrade Scheme, GOV.UK, 2026
  7. Thousands of homes will be eligible for £9,000 off a heat pump, GOV.UK, 2026
  8. Carbon Budget and Growth Delivery Plan: heat and buildings investor factsheet, GOV.UK, 2026
  9. Check if you're eligible for the Boiler Upgrade Scheme, GOV.UK, 2026
  10. Boiler Upgrade Scheme guidance for property owners, Ofgem, 2026
  11. Energy Act 2011, legislation.gov.uk, 2011
  12. Boiler Upgrade Scheme installers, Ofgem, 2026
  13. Boiler Upgrade Scheme guidance for property owners V5, Ofgem, 2026
  14. Boiler Upgrade Scheme guidance for installers V5, Ofgem, 2026
  15. Boiler Upgrade Scheme guidance for installers v5.1, Ofgem, 2026
  16. Boiler Upgrade Scheme statistics, Ofgem, 2026
  17. How savings figures are calculated under the Green Deal's Golden Rule, GOV.UK, 2013
  18. Energy Swap, Energy Ombudsman, 2026
  19. ECO4 delivery guidance v3.2, Ofgem, 2025
  20. Boiler Upgrade Scheme quarterly report issue 14, Ofgem, 2025
  21. Boiler Upgrade Scheme quarterly report issue 13, Ofgem, 2025
  22. Boiler Upgrade Scheme quarterly report issue 17, Ofgem, 2026
  23. BUS property owner guidance V2.3, Ofgem, 2023
  24. Boiler Upgrade Scheme and certification requirements for clean heat schemes consultation, GOV.UK, 2025
  25. Committee assessment of the Boiler Upgrade Scheme, UK Parliament, 2022

Questions

Answers here, and more on their own pages.

Is the Green Deal still available?

No. The Green Deal was a pay-as-you-save financing mechanism launched by the Coalition Government, which let private firms install energy efficiency measures at no upfront cost and recoup the money through a charge on the energy bill. It is a closed scheme. Existing Green Deal plans continue to be repaid by whoever pays the electricity bill at the property, because the charge stays with the meter rather than the person.

Can I use the Boiler Upgrade Scheme to pay off a Green Deal plan?

No. The Boiler Upgrade Scheme provides upfront capital grants towards installing approved low carbon heating, and the full grant value must be deducted from the installer's quote before the property owner pays anything. It is not a debt repayment mechanism and cannot be applied to an outstanding Green Deal charge on the meter.

How much is the Boiler Upgrade Scheme grant?

The standard grant is £7,500 for eligible properties that do not qualify for the uplifted rate. From 21 July 2026, eligible off-gas grid properties with an air-to-water or ground source heat pump can apply for an uplifted grant of £9,000, which is in place until 31 March 2027. Air-to-air heat pumps attract £2,500 and biomass boilers £5,000.

Does the Boiler Upgrade Scheme cover England, Scotland, Wales and Northern Ireland?

No. Only properties located in England and Wales are eligible for Boiler Upgrade Scheme funding. Scotland and Northern Ireland run separate support through their own national schemes, so a householder there cannot apply to Ofgem for a Boiler Upgrade Scheme voucher.

Do I need an EPC to apply for the Boiler Upgrade Scheme?

From 28 April 2026, properties are no longer required to have a valid Energy Performance Certificate to apply for the Boiler Upgrade Scheme. Older guidance required an EPC no more than 10 years old with the certificate number provided. Applications properly made before that date were assessed under the earlier rule.

Can I get a Boiler Upgrade Scheme grant for a hybrid heat pump?

No. You cannot get a grant for a hybrid heat pump system, for example a combination of a gas boiler and an air source heat pump. From 28 April 2026, Boiler Upgrade Scheme heat pumps can be installed alongside supplementary heating appliances, provided those appliances are not fossil fuel based.

What happens to a Green Deal charge when I sell the house?

The charge stays with the house on the energy meter. The Green Deal was designed so that repayments are recouped through a charge in instalments on the energy bill, which means a new occupier inherits the outstanding amount. A solicitor's conveyancing search normally reveals an active plan before completion.

How long does the Boiler Upgrade Scheme run?

The scheme opened on 23 May 2022 and is scheduled to close at 11:59pm on 30 December 2029. Ofgem guidance states the scheme has been extended to 2030, and the uplifted £9,000 off-gas grid grant runs until 31 March 2027. Unspent budget is not carried over to the next scheme year.

Can I get the Boiler Upgrade Scheme grant if I have a gas boiler?Green Deal Finance Mis-Selling: The Closed Scheme and Householder ClaimsHow much is the Boiler Upgrade Scheme grant?The Green Deal: the closed loan scheme and outstanding chargesGreen Homes Grant Installers: The Closed Scheme and Its AftermathBoiler Upgrade Scheme requirements for biomass boilers