How many quotes should you get before hiring a tradesperson?

How many quotes should you get before hiring a tradesperson? Is three really the rule? And how do you compare prices when each quote covers slightly different work?

Three quotes is a good starting point, though a small job may need only one. Compare what each quote includes, check reviews and insurance, and ask about any green heating grants.

A kitchen table in daylight with three separate written quotation documents laid side by side for comparison, each with a blank total line, beside a pen, a pair of reading glasses and a house key resting on the papers.
In this answer
  1. Why Several Quotes Matter
  2. What a Good Quote Sets Out
  3. Comparing Quotes Like for Like
  4. When One Quote Is Enough
  5. Checking Credentials First
  6. Energy Independence for Homes

Short answer

The short answer is three. Citizens Advice advises getting written quotes from at least 3 different traders before deciding on one1, and the Renewable Energy Consumer Code tells consumers to get at least three quotes before contracting with a company2. TrustMark's homeowner guidance puts it as a step in the hiring process: obtain 3 quotes before starting any work3. NICEIC says the same for electrical work, unless the job is minor4.

That is a recommendation, not a legal duty. No regulation obliges a householder to collect three prices before hiring a tradesperson. The rule of three is a consumer-protection convention, repeated across registration schemes and advice bodies because it works: it exposes the spread of prices, the spread of scope, and the firms that will not put anything in writing.

Where three quotes does become a formal requirement is in specific government exemption routes. Under the private rented sector minimum energy efficiency rules, a landlord claiming a high cost exemption must upload copies of 3 quotations from different installers, each showing that the cheapest recommended improvement exceeds £3,500 including VAT5. A separate payback exemption requires copies of 3 quotes from qualified installers plus cost calculations5. So the number is soft guidance for a homeowner and hard evidence for a landlord.

Why several quotes matter for price and fit

A single quote tells you what one firm would charge. Three quotes tell you what the market charges, and where the job sits within it. NICEIC's guidance is direct: especially for larger and more complex projects, it is always worth shopping around and comparing quotes9. The same logic applies to energy work, where the Energy Saving Trust recommends getting more than one assessment so different approaches and recommendations can be compared before deciding10.

The price effect is the obvious one. HETAS, the solid fuel registration body, recommends obtaining at least 3 quotes to ensure the best price for the service required7. Citizens Advice gives the same advice for oil deliveries, where it suggests at least 3 quotes from different suppliers11. The pattern holds across trades: competition is the mechanism, and three is the minimum number that creates it.

Fit matters as much as price. Two installers can quote for the same boiler, heat pump or solar array and propose genuinely different designs: different unit sizes, different siting, different controls, different levels of making good. A second and third quote is how a householder sees those differences rather than accepting the first design offered. For retrofit work, the Energy Saving Trust notes that comparing approaches and recommendations before deciding is the point of getting more than one assessment10.

There is a limit to what quotes can settle. Which? research into heat pump uptake found that among homeowners who had difficulty receiving quotes, 18% found them tricky to compare12. Getting three quotes does not automatically produce three comparable documents. That is a separate problem, and it is the one the next section addresses.

Three printed quotation sheets for the same job lie side by side on a household table, each with plain blank lines and simple blocks where figures and descriptions would be, with a householder's hands resting beside them comparing the pages.
A second and third quote is how different designs and scopes become visible. Image: Illustration

What a good quote should set out

A printed quotation document lying on a kitchen table beside a pen, shown as a physical sheet with six plain headed blocks for scope of work, materials, timescales, payment terms, guarantees and aftercare, each filled only with blank lines, with a householder's hand resting beside it.
A written quotation sets out the work

A quote is not a number on the back of an envelope. The Consumer Protection Association sets out what a proper quote should contain: scope of work, materials and specifications, timescales, payment terms, guarantees and aftercare13. Those six headings are the test. A quote missing any of them is incomplete, whatever the total at the bottom.

The Renewable Energy Consumer Code goes further for its members. All work should be set out in a written quotation before it is carried out, specifying the extent of work, the nature of the fault and any limits to responsibility14. That is a scheme rule binding on code members, not a general legal requirement, but it describes the standard a householder should expect.

Written beats verbal. NICEIC advises householders to obtain at least three written quotations from different contractors15, and the RECC recommends at least three separate quotations before signing a contract16. A verbal estimate cannot be compared, cannot be checked later, and cannot support a complaint if the work diverges from what was described.

"A good quote should set out: Scope of work"
Consumer Protection Association,13

For work that needs building regulations approval, the quote should also say who is handling notification. Solihull Council's homeowner guidance tells householders to get at least 3 quotations for building work17, and the same principle applies to any job where a certificate or notification is part of the deliverable. If the quote is silent on certification, ask before signing.

Comparing quotes like for like

Three quotes only help if they describe the same job. The Consumer Protection Association's guidance on replacing double glazing is blunt: always get three quotes and ensure they are like for like18. The same instruction applies to a boiler, a heat pump or a rewire.

Like-for-like comparison means matching the six headings from the previous section across every quote. Does each quote cover the same unit or specification? The same extent of making good? The same certification and notification? The same workmanship guarantee period? The same payment schedule? Where one quote is silent on a line another quote prices, the totals are not comparable.

What to compareWhy it changes the price
Scope of workA quote that excludes making good or removal is cheaper for a reason13
Materials and specificationsDifferent unit models and grades carry different costs13
TimescalesProgramme and disruption differ between firms13
Payment termsDeposit and staged payment structures vary13
Guarantees and aftercareWorkmanship warranty length and service terms differ13
Certification and notificationWho handles building regulations and scheme paperwork17

Where quotes diverge sharply, the divergence is usually in scope rather than in margin. Which?'s finding that 18% of homeowners with quoting difficulties found quotes tricky to compare12 points at the same problem: the documents are not written to a common template, so the householder has to impose one.

When one quote may be enough

A tradesman kneeling in a kitchen repairing an oven door with a red toolbox and screwdrivers beside him
A small oven repair needs just one quote Image: Which?

The rule of three has exceptions, and the guidance names them. NICEIC's advice to obtain at least three written quotes is qualified: unless it is minor work4. A small repair, a like-for-like replacement or a straightforward service call does not need three prices to establish a fair one.

For minor work, the protection comes from the written quotation itself rather than from competition. The RECC rule that all work should be set out in a written quotation before it is carried out, specifying the extent of work, the nature of the fault and any limits to responsibility14, applies to service and repair work as much as to installations. A single written quote that meets that standard is a better position than three verbal estimates.

Some regulated processes also set their own quotation timelines rather than a number of quotes. One gas network operator commits to issuing a non-standard quotation within 11 working days for certain jobs, and within 21 working days for larger ones19. A new domestic connection is quoted in an estimated 4 days, and a job involving 2 to 4 connections in an estimated 10 days20. Those are service standards from the network, not a count of quotes a householder should gather.

Checking a tradesperson's credentials before you commit

Quotes should be gathered from firms whose registration can be checked. TrustMark's homeowner guidance places obtaining 3 quotes as step 2 of its hiring process3, and the scheme exists so that householders can verify a business before work starts. For electrical work, the registration to check is NICEIC or an equivalent competent person scheme4. For solid fuel and biomass, it is HETAS7. For renewable installations, it is MCS, and the Energy Saving Trust recommends getting quotes from at least three certified installers to make a fair comparison6.

The credential check is not a formality. A quote from an unregistered firm for work that requires notification may leave the householder without the certificate that building regulations approval depends on17. That is a cost that does not appear in any of the three quotes.

For energy installations specifically, the registration bodies and consumer codes are covered in more detail on the pages for MCS certified installers, TrustMark registered businesses and the Renewable Energy Consumer Code. The wider hiring process, from first enquiry to complaint, is set out in the pillar guide.

What it means for a household's energy independence

A householder seated at a kitchen table comparing three printed quotation sheets laid side by side, each showing only blank lines and plain colour bands, with a pen in hand as if ready to mark a choice.
Comparing three quotes before signing

Getting three quotes is a small act with a large effect on the economics of energy independence. A household installing solar, a battery, a heat pump or a boiler is buying a system it will live with for years, and the price it pays is set at the quoting stage. Competition between three firms is the only lever a householder holds over that price.

The dependence that remains is structural. A quote is a price for equipment and labour, not a guarantee of performance, and the household still relies on the grid, a supplier, or a fuel delivery for whatever the system does not cover. The quote stage is where the household can at least ensure it is buying the right system at a checked price from a registered firm, rather than accepting the first offer.

The evidence on comparison is consistent across trades and sources. Citizens Advice, RECC, TrustMark, NICEIC, HETAS and the Energy Saving Trust all land on the same number: three. The number is not magic. It is the smallest count that produces a comparison, and a comparison is what turns a quote into a decision.

Sources20 cited
  1. Before you get building work done, Citizens Advice, 2026-09-20
  2. Consumer top tips, Renewable Energy Consumer Code, 2026-09-19
  3. Homeowner guidance, TrustMark, 2026-09-20
  4. Choosing a registered electrician, Electrical Safety First, 2026-09-19
  5. Guidance on PRS exemptions and exemptions register evidence requirements, GOV.UK, 2026-05-05
  6. Energy saving upgrades for home renovation, Energy Saving Trust, 2026-05-05
  7. Consumer FAQs, HETAS, 2026-04-01
  8. Moving your meter, SSEN, 2026-09-19
  9. Everything you need to know about choosing an electrician, NICEIC, 2025-11-21
  10. Retrofit explained, Energy Saving Trust, 2026-02-06
  11. Help with bills if you use alternative fuels, Citizens Advice, 2023-02-24
  12. Beyond affordability: why heat pumps feel like a gamble, Which?, 2026-07-02
  13. Compare contractors fairly, Consumer Protection Association, 2025-11-27
  14. Consumer code, Renewable Energy Consumer Code, 2026-07-01
  15. How to work with your tradesperson, NICEIC, 2026-09-17
  16. Consumer guide, Renewable Energy Consumer Code, 2026-09-17
  17. Building regulations approval for homeowners, Solihull Council, 2026-09-17
  18. Replace double glazing, Consumer Protection Association, 2023-08-02
  19. Guaranteed standards, SGN, 2026
  20. How much will my new supply cost, Electricity North West, 2026-09-20

Questions

Answers here, and more on their own pages.

Is three quotes a legal requirement or just good practice?

It is good practice, not law. Consumer bodies and registration schemes recommend at least three written quotes, and Citizens Advice, RECC, TrustMark, NICEIC and HETAS all say the same. The one place three quotes becomes a formal requirement is in certain government exemption routes, such as the private rented sector minimum energy efficiency rules, where three quotes must be uploaded as evidence.

How do I get quotes without paying for them?

Most tradespeople quote for free, and independent advice on energy upgrades should also be free. Citizens Advice has argued that tailored, independent advice should be delivered nationally at no cost to help consumers navigate the market. Where a specialist assessment is needed, such as a retrofit assessment, that may carry a fee, so ask before booking.

Should I tell a tradesperson what other quotes I have?

There is no rule either way. What the guidance does say is that comparing quotes is worthwhile, especially for larger and more complex projects. Telling a tradesperson the figure another firm gave can help them sharpen their price, but it can also lead to a quote built around a number rather than the work itself. The scope matters more than the price.

What if all the quotes come back wildly different?

Wide variation usually means the quotes are not describing the same job. Which? found that 18% of homeowners who had difficulty getting quotes found them tricky to compare. Ask each tradesperson to break the quote into scope of work, materials and specifications, timescales, payment terms, guarantees and aftercare, then compare those lines rather than the totals.

How long are quotes valid for?

It depends on the firm. Some published standards set a clear window: one gas network operator states that a service alteration quote is valid for 90 days. Others commit to issuing a quotation within a set number of working days rather than holding a price. Always check the expiry date on the quote itself, because material and labour costs move.

Do I need multiple quotes for small jobs?

Not always. NICEIC advises obtaining at least three written quotes unless the work is minor. For a small repair, a single written quotation setting out the extent of work, the nature of the fault and any limits to responsibility is often enough. The bigger and more complex the job, the more a second and third quote earns its keep.

What should I do if a quote is much cheaper than the rest?

Treat it as a question, not a bargain. A low quote often omits something the others included: certification, notification, making good, or a longer workmanship guarantee. Compare the scope line by line. If the cheap quote covers the same work, ask why it is lower. If it does not, the difference is the missing work, not a saving.

Can I negotiate after receiving a quote?

Yes. A quote is an offer, not a fixed price, and there is no rule against asking a tradesperson to revisit it. What matters is that any change is recorded in writing before work starts. Consumer codes require that all work is set out in a written quotation before it is carried out, so a verbal discount agreed on the doorstep is worth little if it is not on paper.

How many heat pump installer quotes should I get?How to complain about a cancellation chargeHow long should I measure wind before installing a turbine?How much notice do I give my supplier when moving?Can my supplier force me onto a prepayment meter?How often must my supplier read my meter?