Search

Is there a charge for a missed smart meter appointment?

Will I be charged if I miss my smart meter appointment? Can I move it without paying? What happens if the fitter doesn't turn up?

Missed visits cost nothing, and rearranging one is free, but suppliers owe you money when they keep failing to show, and a day off work or a locked meter cupboard can still leave you out of pocket.

A small arrangement on a kitchen table showing a smart meter in-home display standing beside a blank appointment letter in an open envelope, a wall calendar with a circled blank square, and a telephone, the moment of rearranging a missed installation visit.
In this answer
  1. Short Answer
  2. Why Installation Is Free
  3. Causes of Missed Visits
  4. Rearranging an Appointment
  5. Indirect Costs
  6. Your Rights

Short answer

Smart meter installation is free, and there is no published charge for missing, cancelling or rearranging an appointment. Ofgem's consumer guidance is direct: "Contact your supplier to get a smart meter for free"1. The Welsh Government's official guidance says the same, describing installation "which typically takes about 90 minutes and is free of charge"2. The Energy Saving Trust states that "Smart meters are completely free, and there's no upfront charge for the installation"3.

The money in this area moves in the other direction. Where a supplier misses an agreed appointment, changes it without your agreement on less than one working day's notice, or sends an unqualified engineer without the right tools, compensation of £40 is payable4. If that £40 is not paid within 10 working days, a further £40 follows4. In Northern Ireland, NIE Networks pays £50 for a missed appointment at domestic premises5.

What a household does face is indirect cost: the rollout levy on every bill, and the practical consequences of a meter that stops communicating, which can mean estimated bills and manual readings until it is fixed6.

The short answer: no charge attaches to a missed appointment

Nothing in the published rules creates a fee for a household that is out when the engineer calls, or that cancels a visit. The installation itself is free across the sources: Ofgem's guidance says to contact your supplier "to get a smart meter for free"1, Smart Energy GB describes installation "at no extra cost to you"8, and the Smart DCC, which runs the national communications network, states "You can get a smart meter installed by your energy supplier at no extra cost"9. Age UK's guidance is explicit that suppliers "must install smart meters at no extra cost, so you shouldn't be asked to pay to have one installed"10.

The Consumer Council for Northern Ireland's fact sheet goes further on the specific point of a separate charge: "There will be no separate fee for a smart electricity meter installation"11. Smart Energy GB's installation page repeats the position, noting that smart meters "are provided at no extra cost, so you will not have to pay your smart meter installer"12.

Smart meters are optional in Great Britain, and the Welsh Government's guidance notes that without one a household "miss[es] out on easier billing and innovative tariff options"2. That optionality matters here: because a household cannot be compelled to accept an installation, there is no contractual basis on which a supplier could levy a missed-visit fee, and none appears in the guidance.

The one structural cost is shared rather than individual. The rollout is paid for through bills: "the overall cost of the rollout is covered by adding a small extra fee to your energy bill"6. Ofgem's consultation on the guaranteed standards takes the same line on the compensation regime, stating that "Costs imposed on suppliers would not normally pass through to consumers"13.

Why the installation costs you nothing

A simplified isometric installer fitting a smart electricity meter on an interior wall of a home, the compact meter unit fixed to the plasterboard near the consumer unit with a short cable run, while the household watches the completed installation at no charge.
Smart meter fitted on the wall

The reason no charge arises is that the smart meter remains the supplier's asset and the rollout is a licensed obligation, not a customer purchase. Suppliers are required to take all reasonable steps to install smart meters, and the cost sits in the supply business rather than in a transaction with the household9.

That has a practical consequence for anyone weighing up whether to accept a visit. There is no quote to compare, no installer to select and no deposit to lose. The Consumer Council for Northern Ireland's fact sheet confirms there is "no separate fee" for the electricity meter installation11, and Smart Energy GB's installation guidance confirms meters are "provided at no extra cost"12.

"Energy suppliers must install smart meters at no extra cost, so you shouldn't be asked to pay to have one installed."
Age UK,10

The cost recovery is collective. Every bill carries a small levy that funds the programme6, so a household that declines a smart meter still contributes to the rollout through its standing charges and unit rates. That is the honest position on independence: the meter itself is free at the point of installation, but the household is already paying for the programme whether or not it takes part.

For the household's energy independence, a smart meter is a data and access device rather than a generation asset. It gives half-hourly consumption data, enables time-of-use tariffs and prepayment in smart mode, and supports export metering. It does not reduce reliance on the grid or on a supplier, and it introduces a dependence on the national communications network and on the supplier's systems. Where that communications link fails, the meter can drop into what is often called dumb mode, and the household loses the automatic reading function until it is restored14.

What can cause an appointment to be missed

Missed appointments arise from both sides, and the causes differ in who carries the consequence.

On the supplier's side, scheduling is grouped geographically. Smart Energy GB explains that "Smart meter installers group appointments by location so they don't have to travel long distances between installations, reducing the carbon emissions given off when they travel"15. That efficiency means a slot cannot always be refilled at short notice, and a visit can slip when an earlier job overruns.

On the household's side, the common causes are simply not being in, a change of circumstances, or a meter position that turns out to be inaccessible. None of these carries a published charge.

There are also cases where an appointment cannot be offered at all. The National Energy Action guidance on the Radio Teleswitch Service notes that "There are some situations where your electricity supplier won't be able to offer you an appointment for a smart meter upgrade yet and the supplier will get in touch when ready"16. Where a supplier is physically unable to install a smart meter, the proposed guaranteed standards treat a timely appointment as not necessary, under an exemption in the regulations17.

Demand-side evidence suggests booking itself is not always smooth. Official research following 274 consumers trying to get a smart meter found that "only 73% were able to book an appointment"18. That figure is about the booking stage rather than missed visits, but it sets expectations: a proportion of households will need more than one attempt to get a date agreed.

An engineer in a yellow hard hat installing a smart electricity meter in a wall-mounted consumer unit
An engineer in a yellow hard hat installing a smart electricity meter in a wall-mounted consumer unit. Image: smartenergygb.org

Rearranging a missed or cancelled appointment

The route back to a new date runs through the supplier. Ofgem's guidance on meter problems is to "contact your supplier to arrange to have a new smart meter installed"1, and Smart Energy GB describes the normal booking contact: suppliers "will telephone or email you to agree a time to come and change over your meter"8.

Where gas and electricity come from separate suppliers, the Smart DCC notes that "you'll need to book individual appointments with both", and recommends changing the electricity meters first19. That is two visits, two sets of arrangements and two chances of a scheduling problem.

The offer window is set out in Citizens Advice guidance: "Your supplier should offer you an appointment within 30 working days of the day you ask for a smart meter"4. That is the benchmark to hold a supplier to when a rearrangement drags.

The guaranteed standards apply to "all smart meter installation appointments, whether that be a first-time installation or the replacement of an existing smart meter", including work by third-party engineers contracted through meter operators17. So a missed visit by a subcontractor counts the same as one by the supplier's own staff.

Costs that could arise indirectly

A small isometric figure standing in a home kitchen looking at an in-home display on the worktop, its screen showing a plain colour band and simple bar graph of energy use with no readable words or numbers.
In home display showing energy use

No direct charge exists, but three indirect costs are worth knowing about.

The first is the rollout levy. Every energy bill carries a small extra fee that funds the programme6, so the cost is spread across all households rather than charged to those who book.

The second is the consequence of a meter that stops communicating after installation. Smart Energy GB's troubleshooting guidance sets out what happens: "Your bills may temporarily become estimated", manual readings may be needed, and the in-home display may stop updating correctly7. Estimated billing is corrected once a real reading arrives: "Any differences between the estimate and your actual energy use will be corrected on your next bill"20. The Energy Ombudsman has handled cases where a missed meter exchange led to incorrect estimated billing, with the root cause identified as "a delay in the supplier updating its systems"21.

The third is accidental damage. Smart Energy GB notes that "Accidental damage charges may sometimes apply" to the in-home display22. That is the one place in this subject where a household can face a bill, and it relates to the display rather than the meter or the appointment.

ItemPositionSource
InstallationFree, no upfront charge1
Missed appointment by householdNo published charge1
Missed appointment by supplier£40 compensation, plus £40 if unpaid after 10 working days4
Northern Ireland missed appointment£50 at domestic premises5
Rollout costSmall extra fee on energy bills6
In-home display accidental damageCharges may sometimes apply22

Your rights when the supplier keeps missing appointments

The guaranteed standards regime is the main protection, and it is being strengthened. Ofgem's January 2026 final decision sets out a standard for failed installations: "If a smart meter installation fails due to a fault within the energy supplier's control, the consumer will receive compensation"17. A separate proposed standard would pay compensation where "a consumer's smart meter is not operating in smart mode for over 90 days"17. That second standard is proposed rather than in force, and the consultation allows suppliers an extra 30 days where communications hub or wide area network issues have been raised with the DCC23.

The eligibility test for appointment compensation is set out in independent guidance: "you'll be eligible for compensation if the supplier: misses the appointment; changes the appointment without your agreement with less than one working day's notice; or sends an unqualified engineer without the right tools"24. The £40 figure and the further £40 for late payment both come from the same source4.

In Northern Ireland the framework differs. NIE Networks' customer standards state: "If we don't keep an agreed appointment you will receive £50 or £125 for other premises"5. Domestic premises attract the £50 figure.

The government's guide on smart meters sets out the standards suppliers should follow "from arranging an installation appointment to resolving any issues which might occur after installation"20, and confirms that any household that pays for energy, "whether you own or rent your home, should be able to book to have a smart meter installed where it is expected to work in the property"20. Where a meter stops working after installation, responsibility sits with the supplier: "If your smart meter stops working, contact your supplier. They are responsible for maintenance and will fix or replace your meter as needed"2.

For households on prepayment, a separate compensation route exists where a supplier forced a prepayment meter between 1 January 2022 and 21 January 2023 without following the rules properly25. That is a distinct scheme from the smart meter appointment standards and should not be confused with them.

A person holding a smart meter in-home display showing energy usage and budget figures
A person holding a smart meter in-home display showing energy usage and budget figures. Image: Smart DCC
Sources25 cited
  1. Get help with your smart meter, Ofgem, 2026
  2. Smart meters, Welsh Government, 2026
  3. Guide to smart meters, Energy Saving Trust, 2026
  4. Getting a smart meter installed, Citizens Advice, 2026
  5. Customer standards, NIE Networks, 2026
  6. Smart meters explained, Uswitch, 2026
  7. Troubleshooting smart meter issues, Smart Energy GB, 2026
  8. How to get a smart meter, Smart Energy GB, 2026
  9. Do you have to have a smart meter by law?, Smart DCC, 2026
  10. A guide to smart meters, Age UK, 2026
  11. Smart Electricity Meters Fact Sheet, Consumer Council for Northern Ireland, 2026
  12. The installation process, Smart Energy GB, 2026
  13. Smart meter Guaranteed Standards of Performance Draft Impact Assessment, Ofgem, 2025
  14. Smart meter performance, Ofgem, 2026
  15. Getting a smart meter installed, Smart Energy GB, 2026
  16. RTS meters, National Energy Action, 2026
  17. Final decision: smart meter GSOPs, Ofgem, 2026
  18. Smart Meter Guaranteed Standards of Performance, Ofgem, 2025
  19. How to get a smart meter, Smart DCC, 2026
  20. Smart meters: your rights and expectations, Department for Energy Security and Net Zero, 2025
  21. Incorrect estimated billing, Energy Ombudsman, 2026
  22. The in-home display, Smart Energy GB, 2026
  23. Smart Meter Guaranteed Standard Statutory Consultation, Ofgem, 2025
  24. Prepayment meter change to credit meter, Uswitch, 2026
  25. Check if you can get payment after a power cut, Ofgem, 2026

Questions

Answers here, and more on their own pages.

Do I have to pay if I miss my smart meter appointment?

No. Smart meter installation is free of charge, and no supplier rule in the published guidance creates a fee for a household that is not in when the engineer calls. The cost of the rollout is recovered through a small levy on everyone's energy bill, not through charges to individual households for missed visits. If the appointment is missed, the practical step is to contact the supplier and agree a new time.

Will my energy supplier charge me for cancelling a smart meter installation?

There is no published charge for cancelling or rearranging. The guaranteed standards run the other way: where a supplier misses an appointment, changes it without agreement on less than one working day's notice, or sends an engineer without the right tools, compensation of £40 is payable. A failed installation caused by a fault within the supplier's control also triggers compensation under the proposed standards.

How do I rearrange a missed smart meter appointment?

Contact your supplier. Suppliers telephone or email to agree a time to change over the meter, and the same route applies when a visit is missed or needs moving. If you have separate gas and electricity suppliers, each books its own appointment, and it is recommended that the electricity meter is changed first. Your supplier should offer an appointment within 30 working days of your request.

Can I claim compensation if the engineer does not turn up?

Yes, where the supplier is at fault. Compensation of £40 applies if the supplier misses the appointment, changes it without your agreement on less than one working day's notice, or sends an unqualified engineer without the right tools. If the £40 is not paid within 10 working days, a further £40 is payable. In Northern Ireland, NIE Networks pays £50 for a missed appointment at domestic premises.

How much notice will I get before a smart meter installation?

The published guidance does not set a fixed notice period. What it does set is the offer: your supplier should offer you an appointment within 30 working days of the day you ask for a smart meter. Suppliers then telephone or email to agree a specific time. Where a supplier changes an appointment without your agreement on less than one working day's notice, that change itself triggers compensation.

How long does a smart meter installation take?

Around 90 minutes is the typical figure given in Wales's official guidance, and Smart Energy GB puts it at approximately one hour per meter. A separate official source describes a couple of hours, with each supply switched off during the changeover. Where gas and electricity are supplied separately, two appointments are needed, so the total time at the property is longer.

Can I reschedule without penalty if something comes up on the day?

No penalty is published for a household rearranging. The charges and compensation in the rules attach to the supplier's failures, not the household's. If you need to move the visit, contact the supplier and agree a new time. Note that installers group appointments by location to cut travel, so a same-day replacement slot is not always available.