Search

Great Britain

Ofgem publishes ECO4 Measures table version 4.0

Ofgem has published version 4.0 of the ECO4 Measures table, the document listing which energy efficiency measures can be installed under the fourth Energy Company Obligation scheme.

A newspaper on a kitchen table beside a model of grants and schemes

Ofgem published version 4.0 of the ECO4 Measures table on 29 July 20251. The table sets out the energy efficiency measures that can be installed under the fourth Energy Company Obligation scheme, ECO41. Ofgem states that it is not a definitive guide to the scheme rules and must be used alongside the ECO4 Delivery Guidance1.

The table lists measures by category and shows eligibility across four tenure and SAP band combinations: owner-occupied homes in SAP bands D to G, private rented sector homes in SAP bands E to G, social housing in SAP band D, and social housing in SAP bands E to G1. Categories covered include boiler measures, electric storage heaters, district heating connections, heating controls, solar PV, and a range of insulation types1.

Eligibility is marked as eligible or ineligible, with footnoted conditions. Heating controls, including programmer and room thermostat, smart thermostat, TRV, time and temperature zone control and compensation, are eligible in owner-occupied homes and in private rented sector homes subject to footnote 1, which requires one of solid wall insulation, a renewable heating system, first time central heating or a district heating connection to be installed as part of the same project1. Solar PV is eligible in all four tenure columns subject to footnote 2, which requires a hydronic heat pump, an electric storage heater with a SAP responsiveness of at least 0.8, or an electric heating system with a SAP responsiveness of at least 0.8 to be installed as part of the same project, or the property to already be heated by one of these1.

Ofgem notes that for heating measures in particular, including heating controls and solar PV, the ECO4 Delivery Guidance contains additional eligibility rules not covered by the measures table1. It also states that Standard Alternative Methodology and Data Light Measure eligibility is based on the underlying measure type, so a SAM which is a heating control has the same eligibility as other heating control measures1.

The table carries two publication dates in its own text: the introduction sheet records version 4.0 as published on 29/07/2025, while the measures sheet records version 4.0 as published 07/08/20251. No explanation for the difference is given in the document.

MeasureOwner-occupied (SAP D to G)PRS (SAP E to G)Social housing (SAP D)Social housing (SAP E to G)
Programmer and room thermostatEligibleEligible (footnote 1)Eligible (footnote 4)Eligible (footnote 5)
Smart thermostatEligibleEligible (footnote 1)Eligible (footnote 4)Eligible (footnote 5)
TRVEligibleEligible (footnote 1)Eligible (footnote 4)Eligible (footnote 5)
Time and temperature zone controlEligibleEligible (footnote 1)Eligible (footnote 4)Eligible (footnote 5)
Solar PVEligible (footnote 2)Eligible (footnote 2)Eligible (footnotes 2 and 4)Eligible (footnote 2)
Upgrade to a renewable heating systemEligibleEligibleEligible (footnote 4)Eligible (footnote 6)
First time central heatingEligibleEligibleEligible (footnote 4)Eligible

Why it matters for households

The measures table is the reference that determines whether a particular improvement can be funded through ECO4 at all, and under what conditions. For a household, the footnotes matter as much as the tick marks: several measures are only eligible when installed alongside another qualifying measure in the same project. Heating controls and solar PV, for example, are not standalone measures for most tenure types under the conditions set out in the table1. The table also distinguishes between tenure types, so the same measure may be eligible in an owner-occupied home and ineligible in social housing, or eligible only under a footnote condition1. Ofgem directs readers to the ECO4 Delivery Guidance for the full rules, and the table itself states it must be used alongside that guidance1. The Energy Company Obligation is administered under Ofgem's regulatory framework.

What happens next

No next steps are set out in the document. The table records version 4.0 as published on 29/07/2025 in its introduction and as published 07/08/2025 on its measures sheet1. No further revision date has been reported.

Sources1 cited
  1. [](https://www.ofgem.gov.uk/sites/default/files/2025-08/ECO4%20Measures%20Table%20v4.0.xlsx), ofgem.gov.uk